Concrete Technology – Best Practice with Tony Binns

Request info

Course duration: 1 Day

Cost: £295 + VAT

Overview

A one-day course for construction managers, site supervisors and technicians in the control of concrete on site.

Course Outline

Fresh concrete

Consistence requirements: Getting the right slump and getting the slump right

Checking cohesion: Problems of segregation, honeycombing, bleeding and reinforcement ripple

Concrete schedules: Strength, water/cement ratio, minimum cement content and slump

Concrete strength: The meaning of C40/50 etc

Durability and how it is achieved: Resistance to cracking, abrasion, freezing

Placing and compacting concrete on site: The myth of over-vibration

Correct use of poker vibrators and beam vibrators

Curing: What it means and why it matters

Accepting readymix on site
– What to watch for: slump, uniformity, appearance
– What not to sign for: time limitations, adding water to concrete on site

Sampling and testing fresh concrete
– Slump test, cube making, storing and curing cubes
– What to do when the cubes fail

Action plan

Questions, answers and discussion

SELECT wp_posts.*, wp_p2p.* FROM wp_posts INNER JOIN wp_postmeta ON ( wp_posts.ID = wp_postmeta.post_id ) INNER JOIN wp_p2p WHERE 1=1 AND ( ( wp_postmeta.meta_key = 'start_date' AND CAST(wp_postmeta.meta_value AS DATE) >= '2024-09-19' ) ) AND ((wp_posts.post_type = 'schedule' AND (wp_posts.post_status = 'publish' OR wp_posts.post_status = 'acf-disabled'))) AND (wp_p2p.p2p_type = 'schedule_to_courses' AND wp_posts.ID = wp_p2p.p2p_from AND wp_p2p.p2p_to IN (SELECT wp_posts.ID FROM wp_posts WHERE 1=1 AND wp_posts.ID IN (735) AND ((wp_posts.post_type = 'courses' AND (wp_posts.post_status = 'publish' OR wp_posts.post_status = 'acf-disabled'))) ORDER BY wp_posts.post_date DESC )) GROUP BY wp_posts.ID ORDER BY CAST(wp_postmeta.meta_value AS DATE) ASC